+92 51 92743557 secretary@ffbl.com

Energy Balance

Each unit will be designed, manufactured, installed and commissioned as per internationally accepted practices and standards. The Project’s estimated key performance data and energy balance is set out below:

  • Power Installed Capacity 118 MW
  • Installed FFBL Power Capacity at 60 Hz 58 MW; for FFBL and Auxiliary power consumption
  • K‐Electric/Bulk Power Consumers at 50 Hz 60 MW
  • Days Operation 310
  • Net Plant Efficiency % 29.2